Saturday, 24 March 2012

Portsmouth

this performance was our worst.
i didnt like performing outside, having audience walk in and out of our show. we forgot lines, ques, story order. it just looked rubbish

Friday, 23 March 2012

Strike

during the strike we took apart all of the flats, cleaned and sorted the props and costume cupboards and loaded all props and costume that we needed into Jamies car for him to take to Portsmouth for us

Wednesday, 21 March 2012

2nd and 3rd Performance

these performances didnt go as well as the first as we forgot lines and ques. we still tried our best

Tuesday, 20 March 2012

First Performance

Our first live performance, we were very proud of our achievements of staying in character, remembering our lines, cues were on point and overall the audience loved it.

Open Dress Rehearsa

open dress is where we performed to a small audience. i thought this performance didnt go as well as we hoped as ever forgot lines, props and ques.
the best part was the story of the little begger

Monday, 19 March 2012

Tech Rehearsal

a producative day with 2 run throughs

notes:
  • remember to apply elements to characters
  • Need quicker timing and cues on the story of 'The Envious Sisters'
  • Feel gaps of silence or movmenet by playing around with your character.
  • Set your prop before hand, no messing around running behind stage.
  • Bigger gestures and bigger physicaility to show off character for the audience.

Thursday, 15 March 2012

Gavin

    we did a Run-Thorugh of the whole play, as we have blocked everything.
    the second haf of the play runs better than the first